 May 17, 2010
Mount Polley Update on Mineral Reserve /Resource Estimates and Exploration Drilling

 
Vancouver -- May 17, 2010 - Imperial Metals Corporation (III-TSX) reports the updated mineral reserve and mineral resource estimates for its wholly owned Mount Polley open pit copper/gold mine located in central British Columbia.

The Mount Polley reserve and resource estimate has been updated as of January 1, 2010 and incorporates open pit mining from the Southeast, C2, Pond, Boundary and Springer pits. Reserves are 40.5 million tonnes of 0.318% copper, 0.282 g/t gold and 0.606 g/t silver. The current reserve provides for a mine life to the fourth quarter of 2015 and contains 284 million pounds of copper and 367 thousand ounces of gold. The stripping ratio on the remaining reserve is now less than 2 to 1.

Mount Polley Proven and Probable Reserves (1)
March 2010 update based on January 1, 2010 topography
      Grade   Contained Metal
 
Tonnes
Ore
Copper
Eq
Copper
%
Gold
g/t
Stripping Ratio
Copper (lbs)
000's
Gold (oz)
000's
Total
40,498,052
0.498
0.318
0.282
1.8
284,251.7
367.3
(1) Released in 2009 Annual Information Form dated March 30, 2010.



In addition to the updated Mount Polley reserve there are 167.7 million tonnes of mineral resources in the measured and indicated category, and 3.66 million tonnes of mineral resources in the inferred category. For three of the zones where underground mining is being considered, a resource category including only blocks with a mill head value (MHV) of over $40.00/ tonne and $80.00/tonne have been included. MHV is the total value of the recovered metals in one tonne of mill feed, minus all costs excluding mining. These costs include milling, concentrate transportation, smelting and refining costs.

A 500 metre long ramp is currently being collared in the Wight pit. The ramp will be used to further explore and access the 517,066 tonnes grading 2.45% copper, 1.50 g/t gold and 14.00 g/t silver of measured and indicated resource in Boundary/Zuke zone.

Resource values were identified by summing all blocks that fall outside of the economic pit and having a block grade greater than 0.25 copper equivalent. The copper equivalent was calculated using relative recovery and metal price for copper, gold and silver. The resources were classified as inferred, indicated and measured based on three items: minimum number of drill holes used in the estimate; minimum number of composites; and the maximum distance to the nearest composite.

The parameters used in the updated Mount Polley resource are based on revised pit designs and the current Mount Polley production schedule. The current pit designs were based on US$2.75 copper, US$950.00 gold, US$12.00 silver and $1.05 CDN/US exchange rate.

Mount Polley: Resource by Zone Excluding Pit Reserves *
[resource values based on 0.25 Copper Equivalent Cut-Off]
      Grade Contained Metal
Zone
Tonnes Ore
Copper
Eq
Copper
%
Gold
g/t
Silver
g/t
Copper (lbs)
000's
Gold
(oz)
000's
Silver (oz)
 000's
Boundary/Zuke
Measured+Indicated
3,711,373
0.824
0.595
0.372
3.109
48,677.5
44.4
371.0
including MHV > $40.00/Tonne
517,066
3.363
2.450
1.500
13.993
27,929.5
24.9
232.6
includingMHV >$80.00/Tonne
295,329
4.631
3.433
1.996
17.780
22,351.7
19.0
168.8
Inferred
20,728
0.496
0.365
0.213
1.453
166.9
0.1
1.0
Northeast
Measured+Indicated
20,819,548
0.708
0.566
0.210
3.972
259,985.3
140.7
2,658.6
including MHV>$40.00/Tonne
3,063,499
1.425
1.156
0.392
8.476
78,091.4
38.6
834.8
includingMHV >$80.00/Tonne
222,831
2.503
2.031
0.687
15.009
9,977.9
4.9
107.5
Inferred
2,296,482
0.433
0.341
0.142
1.873
17,269.3
10.5
138.3
Springer
Measured+Indicated
79,640,594
0.491
0.303
0.297
0.347
531,834.4
759.7
888.8
Inferred
411,954
0.405
0.235
0.267
0.256
2,136.1
3.5
3.4
Junction
Measured+Indicated
16,900,421
0.437
0.291
0.232
n/a
108,366.3
126.1
n/a
Inferred
32,643
0.381
0.244
0.219
n/a
175.7
0.2
n/a
Bell
Measured+Indicated
10,538,533
0.416
0.232
0.234
n/a
54,004.3
79.1
n/a
Inferred
828,312
0.372
0.236
0.174
n/a
4,309.6
4.6
n/a
C2
Measured+Indicated
13,135,522
0.418
0.214
0.326
n/a
61,884.6
137.6
n/a
Southeast
Measured+Indicated
19,475,055
0.431
0.164
0.417
1.080
70,311.2
260.9
676.4
Inferred
70,105
0.425
0.226
0.310
0.869
349.8
0.7
2.0
Pond
Measured+Indicated
3,449,455
0.673
0.476
0.287
5.423
36,200.8
31.8
601.4
includingMHV >$40.00/Tonne
583,248
1.573
1.144
0.622
13.903
14,707.1
11.7
260.7
Total Resource
 
 
 
 
 
 
 
 
Measured+Indicated
167,670,501
0.506
0.317
0.293
1,171,264.5
1,580.5
n/a
includingMHV >$40.00/Tonne
4,163,813
1.686
1.315
.562
9.921
120,728.0
75.2
1328.2
includingMHV >$80.00/Tonne
518,160
3.716
2.830
1.433
16.588
32,329.6
23.9
276.3
Inferred
3,660,224
0.416
0.302
0.168
24,407.3
19.7
n/a

n/a silver assay values not significant in this zone
* Proven and Probable Reserves are not included in these resource values


The ore reserves and resources were calculated and verified by Art Frye, Mine Operations Manager, Mount Polley Mining Corporation, and Greg Gillstrom, P. Eng., Geological Engineer, Imperial Metals Corporation, the designated Qualified Person as defined by National Instrument 43-101. Mr. Gillstrom and Mr. Frye have reviewed the contents of this release.

Exploration Update

Drilling was initiated in late January and has been ongoing at Junction, Springer, WX, Boundary, Pond and Southeast zones with focus on exploration and definition of near pit resources. Exploration drilling also took the first major step to test high priority anomalies from the 2009 Titan geophysical survey. Drilling on the Titan anomalies provided confidence that major geologic features can be identified using the technique and has led to development of additional exploration targets, including a potential faulted offset of the Pond zone at the Ace zone.

Pond zone drilling targeted skarn hosted mineralization below the Pond pit which was initiated in the fall of 2009. Highlights of the drilling include drill hole PZ10-55 which returned 90.0 metres grading 1.23% copper and 0.60 g/t gold and included a higher grade 15.5 metre section grading 3.73% copper and 2.09 g/t gold. Drill hole PZ10-58 returned 13.3 metres grading 1.93% copper and 0.39 g/t gold at 147.5 metres, and PZ10-52 returned 12.2 metres grading 4.25% copper and 1.26 g/t gold including 5.7 metres of 8.34% copper and 2.22 g/t gold. The Pond zone appears to be structurally terminated at the south end but work is now underway to predict the offset location of a potential continuation of that zone. The 2009 geophysical survey is playing a key role in that predictive targeting and thus far has proven to be an effective technique to reveal major geologic breaks which had not been previously well defined.

Pond
Drill Hole #
Total
Length (m)
Interval
from (m)
Interval
to (m)
Interval
Length (m)
 
Copper %
 
Gold g/t
 
Silver g/t
PZ10-52 384.3
283.9
296.1
12.2
4.25
1.26
34.37
including  
290.3
296.1
5.7
8.34
2.22
65.1
PZ10-55 326.4
147.5
237.5
90.0
1.23
0.60
13.9
including  
213.9
229.4
15.5
3.73
2.09
44.9
PZ10-58 325.2
147.5
160.8
13.3
1.93
0.39
29.1


New drilling at the Boundary zone includes two holes drilled from surface to follow up on the 2009 success, including ND10-102 which intersected 111.4 metres grading 0.97% copper and 0.70 g/t gold, including 10.3 metres of 1.51% copper and 1.64 g/t gold and 31.4 metres grading 2.33% copper and 1.46 g/t gold. Also a near horizontal hole was collared at the north end of the Wight pit, to provide geotechnical information for the planned 500 metre decline ramp. Drilling in this area will include underground drilling from the decline when it is complete, and surface drilling on the west side of Boundary zone.

Boundary
Drill Hole #
Total
Length (m)
Interval
from (m)
Interval
to (m)
Interval
Length (m)
 
Copper %
 
Gold g/t
 
ND10-102
395.3
210.0
321.4
111.4
0.97
0.70
 
including
210.0
220.4
10.3
1.51
1.64
 
including
290.0
321.4
31.4
2.33
1.46
 


Junction zone is currently a high priority target at Mount Polley due to its proximity to the Springer pit. Drill hole JZ10-46 was collared 240 metres north of the planned northern rim of the Springer pit and intersected 109.1 metres of 0.19% copper and 0.28 g/t gold, including 40.1 metres grading 0.25% copper and 0.51 g/t gold, both intervals starting at 139.9 metres depth. These intercepts are particularly intriguing in that the gold to copper ratio is high relative to values normally observed at Springer. This zone discovered in 2009 now has a 16.9 million tonne measured and indicated resource and will be an area of focus for exploration in 2010.

Junction
Drill Hole #
Total
Length (m)
Interval
from (m)
Interval
to (m)
Interval
Length (m)
 
Copper %
 
Gold g/t
 
JZ10-46
249.0
139.9
249.0
109.1
0.19
0.28
 
including
139.9
180.0
40.1
0.25
0.51
 
JZ10-47
394.4
365.0
392.5
27.5
0.33
0.13
 


The WX zone, like the Junction, is also a high priority target due to proximity to the Springer pit. Located directly south of Springer, the WX has returned intercepts of relative good grades, and a notable high gold to copper ratio. Drill hole WX10-03 includes 160.0 metres grading 0.24% copper and 0.37 g/t gold, including 14.2 metres grading 0.52% copper and 1.25 g/t gold. Near depth at 345.0 metres drilling returned 7.5 metres grading 0.33% copper and 1.86 g/t gold.

WX
Drill Hole #
Total
Length (m)
Interval
from (m)
Interval
to (m)
Interval
Length (m)
 
Copper %
 
Gold g/t
 
WX10-03
380.1
50.0
210.0
160.0
0.24
0.37
 
including
158.3
172.5
14.2
0.52
1.25
 
and
345.0
352.5
7.5
0.33
1.86
 


Exploration drilling is expected to continue with two drill rigs for the rest of the 2010 exploration season. Imperial will continue to conduct mapping, trenching and other supportive exploration techniques to aid in the generation of new drill targets. A drill plan map is available on the Company's website.

Steve Robertson, P.Geo. is the designated Qualified Person as defined by National Instrument 43-101 for the exploration programs. Samples for the diamond drilling reported at Mount Polley were analyzed at the Mount Polley mine laboratory and Acme Analytical Laboratories in Vancouver. A full QA/QC program using blanks, standards and duplicates was maintained for all samples submitted to the labs. The porphyry and breccia related deposits at Mount Polley are irregular in shape and true thicknesses have not been estimated.

Contact: Brian Kynoch, President 604.669.8959; Patrick McAndless, Vice President Exploration 604.488.2665;
Sabine Goetz, Investor Relations 604.488.2657 // website: www.imperialmetals.com // email: info@imperialmetals.com


View accompanying maps *

View drill results**
 
 

You can return to the Top of this page

You can view the Next News Release 2010 item: Mon Jul 12, 2010, Ruddock Creek Project - Memorandum of Understanding Completed

You can view the Previous News Release 2010 item: Wed May 12, 2010, Imperial Reports 2010 First Quarter Financial Results

Adnet Communications Inc.