|
Surface drilling at Flourspar Canyon 130 KB, approx. 25 seconds at 56.6Kbps |
|
Underground drilling of the 144 Zone 119 KB, approx. 23 seconds at 56.6Kbps |
|
Preparing to Collar Portal 72 KB, approx. 14 seconds at 56.6Kbps |
|
Decline Ramp 28 KB, approx. 6 seconds at 56.6Kbps |
|
Underground Drilling 63 KB, approx. 13 seconds at 56.6Kbps |
|
Exploration Crew 50 KB, approx. 10 seconds at 56.6Kbps |
|
Drilling Hole ST03-50 118 KB, approx. 23 seconds at 56.6Kbps |
|
Sterling Drilling 116 KB, approx. 23 seconds at 56.6Kbps |
|
collecting RC Drill Samples 121 KB, approx. 23 seconds at 56.6Kbps |
|
Emptying Core Tube 99 KB, approx. 19 seconds at 56.6Kbps |
|
view north towards 144 Zone; drilling hole ST03-52 99 KB, approx. 20 seconds at 56.6Kbps |
|
view to east towards Crater Flat; 144 Zone in foreground 97 KB, approx. 19 seconds at 56.6Kbps |