Reserve

The December 31, 2016 reserve estimate was prepared under the supervision of Kent Christensen, P.Eng., General Manager, designated as the Qualified Person as defined by NI 43-101. The 2011 Huckleberry Report provides discussion of the key assumptions, parameters, and methods used to estimate mineral reserves and risks that could materially affect the potential development of the mineral reserves.

Probable Mineral Reserve Estimate @ cut-off grade 0.150% Copper (excluding stockpiles)

Ore (tonnes) Copper %
MZO 34,960,000 0.324